New Construction & Remodel Prewire in SW Missouri & Northwest Arkansas
Ozark Smart Home prewires new construction and major remodels for homes 4,000 square feet and larger in Joplin, Springfield, Branson and Northwest Arkansas. We walk the framed house with you and your builder, mark every access point, camera, keypad, speaker and shade, and run it all to a central rack before insulation and drywall.

What’s Included
- Framing walkthrough with you and your builder
- Rack location, power and ventilation plan
- Cat6 for access points, cameras and TVs
- Speaker, keypad and shade wiring
- Conduit for future upgrades
- Labeled wiring map at handoff
Good to Know
- Book the walkthrough as soon as framing is scheduled; the prewire window is short.
- Electrical circuits and panel work stay with your electrician; we coordinate with them.
And how we build it instead
The cheapest time to wire a smart home is the few weeks between framing and drywall. Miss it, and every future upgrade means cutting into finished walls.
We coordinate with your builder and electrician, plan the rack location with power and ventilation, and run Cat6, speaker wire, shade power and conduit for the future.
The finished home has no visible cables, no patchwork, and a documented wiring map that makes every future addition simple.
New Construction & Remodel Prewire: how to choose
- Timing
- A good integrator is on site between rough electrical and insulation, not after drywall.
- Builder coordination
- Ask how the integrator works with your builder and electrician.
- Future-proofing
- Conduit and spare runs now cost far less than opening walls later.
How smart home prewire is scoped
Prewire is scoped from your plans and a framing walkthrough: rooms, drops, rack location and the systems you want now and later. The written scope lists every run with a fixed price for the work. It most often lands in the Signature package (full integration).
Smart Home Prewire, step by step
- 1
Plan Review
We review your plans with you and your builder and mark every device location.
- 2
Written Prewire Scope
Drop list, rack plan and conduit plan, with a fixed price for the work.
- 3
Rough-In & Trim-Out
Run and label every cable before drywall, then return to trim out and commission.
Smart Home Prewire across the Ozarks
Frequently Asked Questions
When should smart home wiring happen in a new build?
After framing and rough electrical, before insulation and drywall. That window is short, so book the walkthrough as soon as framing is scheduled.
Do you work with my builder and electrician?
Yes. We coordinate rack location, power and schedules with your builder and electrician so nothing gets missed.
Can we prewire now and add equipment later?
Yes. Many owners prewire every location during construction and phase in equipment after move-in.
Ready for smart home prewire done right?
One call books the walkthrough. You get a written scope before any work starts.
